研究成果


           期刊論文
English Journal Paper:
  1. Chang, L. C., Y. W. Chen, M. S. Yeh, 2009: Optimizing System Capacity Expansion Schedule for Groundwater Supply, Water Resources Research, (accepted) (abstract)
  2. Chang, L. C., J. P. Tsai, H. Y. Shan, H. H. Chen, 2009: Experimental Study on Imbibition Displacement Mechanisms of Two-Phase Fluid Using Micro model, Environmental Earth Science, DOI: 10.1007/s12665-009-0085-6, (published on line) (abstract)
  3. Chang, L. C., H. H. Chen, H. Y. Shan, J. P. Tsai, 2008: Joint impact of hysteresis and scaling rule on the NAPLs transport simulation, Environmental Modeling and Assessment, (accepted) (abstract)
  4. Chu, H. J. and L. C. Chang, 2008: Application of optimal control and fuzzy theory for dynamic groundwater remediation design, Water Resources Management, DOI: 10.1007/s11269-008-9293-1, (publish on line ) (abstract)
  5. Yang, C. C., L. C. Chang, C. S. Chen, and M. S. Yeh 2008: Multi-Objective Planning for Conjunctive Use of Surface and Subsurface Water Using Genetic Algorithm and Dynamics Programming, Water Resources Management, (publish on line) (abstract)
  6. Chang, L. C., H. H. Chen, H. Y. Shan, J. P. Tsai, 2008: Effect of connectivity and wettability on the relative permeability of NAPLs, Environmental Geology, (publish on line) (abstract)
  7. Yang, C. C., L. C. Chang, C. H. Yeh and C. C. Ho, 2008: Application of System Dynamics with Impact Analysis to Solve the Problem of Water Shortages in Taiwan, Water Resources Management, (publish on line) (abstract)
  8. Yang, C. C., L. C. Chang, C. H. Yeh and C. S. Chen, 2007: Multiobjective Planning of Surface Water Resources by Multiobjective Genetic Algorithm with Constrained Differential Dynamic Programming,Journal of Water Resources Planning and ManagementASCE, Vol. 133, No. 6,pp 499-508. (abstract)
  9. Chang, L. C., H. J. Chu, and C. T. Hsiao, 2007, Optimal planning of a dynamic pump-treat-inject groundwater remediation system, Journal of hydrolology, Vol. 342, Issues 3-4, pp295-304. (abstract)
  10. Yeh, M.S., Y.P. Lin, and L.C. Chang, 2006: Designing an optimal multivariate geostatistical groundwater quality monitoring network using factorial kriging and genetic algorithms ,Environmental Geology ,Vol.50 , No.1, pp 101-121 (abstract)
  11. Hsiao, C. T. and L. C. Chang, 2005: Optimizing Remediation for an Unconfined Aquifer using a Hybrid Algorithm, Ground Water, Vol. 43, No. 6, pp 904-915. (abstract)
  12. Chu,H.J., C.T. Hsiao,and L.C. Chang, 2005: Optimal remediation design in groundwater systems by intelligent techniques , LECTURE NOTES IN ARTIFICIAL INTELLIGENCE 3682: 628-634 (abstract)
  13. Chang, L. C. and C. T. Hsiao, 2002: Dynamic optimal Groundwater Remediation including fixed and operation costs” Ground Water, Vol. 40, No. 5, pp 481-490. (abstract)
  14. Hsiao, C.T. and L.C. Chang, 2002:Dynamic Optimal Groundwater Management with Inclusion of Fixed Costs, Journal of Water Resources Planning and Management, ASCE, Vol.128, No.1, pp.57-65. (abstract)
  15. Chang, L.C. and C.T. Hsiao, 2001:Optimization of Fixed and Operating Costs of Wells for Groundwater Remediation Using Optimal Control and Genetic Algorithms, Journal of Hydroscience and Hydraulic EngineeringJSCE, Vol.19, No.2, pp.11-30. (abstract)
  16. Chang, L.C. and C.C. Yang, 2001: Optimizing the Rule Curves for Multi-Reservoir Operations Using a Genetic Algorithm and HEC-5, Journal of Hydroscience and Hydraulic Engineering, JSCE, Vol.20, No.1, pp.59-75. (abstract)
  17. Yang, C.C. and L.C. Chang, 2001, “Enhanced Efficiency on the Parameter Estimation of Muskingum Model Using Artificial Neural Network”, Journal of Hydroscience and Hydraulic Engineering, JSCE, Vol.19, No.2, pp.47-56. (abstract)
  18. Su, H.C. and L.C. Chang, 2000, “Comparison of Genetic Algorithms with Other Methods for Groundwater Monitoring Network Planning Based on Geostatistics” , Journal of Hydroseience and Hydraulic Engineering, JSCE, Vol.18, No.2, pp.1-14. (abstract)
  19. Yang, C.C., L.C. Chang and C.S. Chen ,1999, “Comparison of Integrated Artificial Neural Network with Time Series Modeling for Flood Forecast”, Journal of Hydroseience and Hydraulic Engineering,JSCE, Vol.17, No.2, pp.37-50. (abstract)
  20. Chang,L.C., C.A. Shoemaker and P.L-F Liu, 1992, “Optimal Time Varying Pumping Rates for Groundwater Remediation: Application of a Constrained Optimal Control Algorithm”, Water Resources Research, 28, (12), pp.3157-3173. (abstract)

Top

中文期刊:
  1. 張良正、陳宇文、朱宏杰、黃浚瑋( 2008 ),遺傳演算法與類神經網路於地表地下聯合營運之應用,農業工程學報,Vol.54,No.2, pp.81-93.
  2. 張良正、葉明生、陳宇文(2007),”人工湖之規劃與營運探討”, 土木水利,Vol.34, No.4 2007.08, pp 86-94
  3. 張良正、葉明生、陳宇文、蕭金財(2007),”考慮容量擴張之非拘限含水層水量管理規劃”,中國土木水利工程學刊, Vol.19, No.1, pp.527-535 (abstract)
  4. 張良正、蔡瑞彬 、陳鴻輝(2006) ,”應用微模型於流體對間置換機制之研究 ” ,中國土木水利工程學刊,Vol.18,No.4, pp.593-602.
  5. 張良正、朱宏杰、陳宇文、陳信華(2006)“遺傳演算法與試驗設計原理地下水井網設計之應用”,農業工程學報,Vol.52,No.2, pp.1-11.
  6. 朱宏杰、蕭金財、張良正(2005),“最佳抽灌處理型地下水污染整治規劃研究”,中國土木水利工程學刊,Vol.17,No.4, pp.603-612. (abstract)
  7. 張良正、蕭金財(2001),“非拘限含水層之最佳水量管理規劃”,中國土木水利工程學刊,Vol 14, No 3, pp477-487. (abstract)
  8. 張良正、單信瑜、陳鴻輝、歐國隆(2001),“遲滯效應與尺度原則對非水相液於孔隙介質中傳輸模擬之影響”,中國土木水利工程學刊,Vol.13,No.4, pp.747-759. (abstract)
  9. 蕭金財、張良正(2000),“應用平行序率最佳控制演算法於多目標水庫系統之優選操作”,中國土木水利工程學刊,Vol.12, No.3, pp.551-560. (abstract)
  10. 蕭金財、張良正(1998),“多目標水庫序率最佳操作模式之建立與應用”,台灣水利,Vol.46, No.1, pp.72-83. (abstract)
  11. 蕭金財、張良正、許鈺珍(1997),“應用序率最佳操控制於水庫系統之優選操作”,中國土木水利工程學刊,Vol.9, No.3, pp.449-457. (abstract)
  12. 潘禎哲、張良正(1996),”降低變異數分析之改良於地下水觀測井網規劃之應用”,中國土木水利工程學刊,Vol.8, No.2, pp.253-262. (abstract)

Top